Project: Vardnili HPP 1 Rehabilitation
Location: Georgia, Gali region
Client: Engurhesi LTD
Timeline: 2014 – 2017
Project description: Vardnili HPP 1 is located on the river Eristskali in Gali region. It is part of Enguri HPP Cascade and located downstream of Enguri HPP. The power plant includes the following structures: Earthfill Dam (height 63m), power intake, spillway with capacity 600 m3/s, spillway channel, bottom outlets and diversion tunnel (Diameter 6m, Length 100m), HPP building. Installed capacity of HPP is 220 MW, annual production 660 GWh. Design discharge 500 m3/s, head 73 m.
Main quantities:
• Soil excavation 115 m3,
• Rock excavation 452 m3;
• Reinforcement works 278 t;
• Formworks 5093 m2;
• Concrete works 2638 m3;
• Drainage and dewatering 2624 m/h;
• Drilling and anchoring 5506 m;
• Scaffold Installation and dismantling 5326 m2;
• Steel pipe installation (d=800 mm) 383 m;
• Installation of a plastic pipe (d=137mm) 1270 m;
• Cutting down forests 1400 m2.