Concrete lining of the dividing Dam of Bodorna reservoir and reserve channel – 2019

About Project

title

Project: Construction of the dividing Dam of Bodorna reservoir and reserve channel
Location: Georgia, Dusheti Municipality
Client: Georgian Water and Power LTD (GWP)
Timeline: 07.06.2019- 07.07.2019

Main quantities:
• Soil excavation                                                 19530 m3;
• sand-gravel layer                                                8350m2;
• Basalt Reinforcement                                     10700 m2;
• Concrete works                                                1620 m3;

shape